Why Your Change Advisory Board Slows Down IT Delivery
It's 10:00 a.m. on a Tuesday. Fourteen people are on a bridge line, looking at a spreadsheet with 43 rows. Row 19 is a firewall rule change for a non-production subnet. It's been in the queue for three weeks. The network engineer who built it isn't on the call because she's fighting a real outage. So the room spends eleven minutes debating a change nobody in the room actually understands, and then approves it anyway.
If that felt uncomfortably familiar, you're not alone. Somewhere along the way, the change advisory board stopped being a risk-management tool and became a scheduling bottleneck that nobody wants to kill because killing it feels irresponsible. The meetings happen. The forms get filled out. The approvals get logged. And IT delivery still crawls.
Here's the uncomfortable part: the CAB is usually making your organization less safe, not more. It trains people to hide changes rather than surface them. It puts decision-making authority in the hands of people with the least context. It treats a password reset and a core database migration as though they belong in the same workflow.
The good news is that this is a solved problem. We know what top-performing IT organizations do instead, and the research on it goes back more than two decades. This article walks through why the CAB slows you down, what the data actually says about change and failure, and how to rebuild change management so it moves work forward instead of parking it in a queue.
What a Change Advisory Board Is Actually For
Strip away the ceremony and change management exists to answer three questions:
- Will this change break something?
- If it does, who will notice, and how fast can we recover?
- Who needs to know this is happening?
That's it. Everything else — the weekly meeting, the change calendar freeze, the 12-field request form, the sign-off from an application owner who left the company two years ago — is scaffolding someone built around those three questions at a moment when the answers were hard to get.
The original intent was reasonable. In the late 1990s and early 2000s, IT environments were opaque. Nobody had a reliable CMDB. Monitoring was thin. Rollback plans were often "restore from tape and hope." In that world, a room full of senior people asking hard questions before a change went in was genuinely the best available control. It was a human substitute for a system that couldn't tell you what was connected to what.
Twenty years later, we have better tools. Version control, infrastructure as code, canary deployments, feature flags, automated rollback, real observability. And yet many organizations never removed the scaffolding. They kept the weekly meeting and layered new tooling on top of it, so now they have the cost of both.
Meanwhile, the definition of "change" exploded. When a CAB was designed, a change meant a server got patched or an application got upgraded. Today, a single CI/CD pipeline can push dozens of changes in an afternoon. A cloud team can spin up infrastructure in a pull request. If every one of those events has to be reviewed by a committee, the committee becomes the constraint, and the organization routes around it — usually by declaring things "standard changes" until the category swallows 80% of the work and the CAB is reviewing nothing of consequence anyway.
The Symptoms: How You Know Your CAB Has Become a Bottleneck
Most IT leaders can feel the problem before they can name it. These are the patterns that show up again and again.
Symptom 1: Low-risk changes wait weeks for approval
If a DNS record change or a patch to a dev environment sits in a queue for 15 days, your CAB isn't managing risk. It's managing a calendar. Time-in-queue is not a control; it's a delay that produces no additional safety. In fact, the longer a change sits, the staler its risk assessment becomes — the environment it was assessed against has moved on.
Symptom 2: The meeting reviews everything, so it effectively reviews nothing
A 60-minute meeting with 40 changes on the agenda gives each item roughly 90 seconds, minus the time spent on the two items that spark debate. That's not review. That's rubber-stamping with extra steps. And everyone in the room knows it, which erodes the credibility of the whole process.
Symptom 3: Attendance sprawls to anyone who might care
The invite list grows because "we should have someone from security there" and then "we should have someone from the business" and then "legal asked to join." Now you're burning 14 senior salaries for an hour a week — call it 700 person-hours a year — to approve firewall rules and certificate renewals.
Symptom 4: Emergency changes outnumber planned ones
This is the clearest tell. If more than about 20–25% of your changes go through the emergency path, your standard path is too slow to be usable. People aren't being reckless; they're being rational. The emergency path exists, it works, and it's faster. So it wins.
Symptom 5: Engineers learn to work around it
Changes get bundled into larger releases so they only need one approval. Small improvements get dropped. Fixes get applied "outside the process" and documented later, if at all. Each workaround makes the change record less accurate, which makes the next risk assessment worse, which justifies more control, which drives more workarounds. It's a loop, and it only tightens.
Symptom 6: The CAB can't explain its own value
Ask the board chair what the CAB caught last quarter. If the answer is "well, we did reject a few things," that's not an outcome. Compare the number of changes the CAB stopped against the number of incidents that originated in changes that passed through it. If almost nothing gets caught and incidents still happen, the board is producing paperwork, not safety.
| Symptom | What it looks like in practice | What it usually means |
|---|---|---|
| Queue time > 5 days | Engineers batch changes to avoid repeat approvals | Approval throughput, not risk, is the constraint |
| 90%+ approval rate | Board approves nearly everything it reviews | Review is ceremonial |
| Emergency changes > 25% | Ops teams routinely bypass the standard path | Standard path is too slow to be viable |
| Growing invite list | 12–20 attendees, most silent | No defined decision rights |
| Change success flat | Failure rate unchanged year over year | Controls aren't addressing actual failure causes |
Why the CAB Slows Everything Down: Five Structural Causes
The slowdown isn't caused by lazy reviewers or bad intentions. It's baked into the structure. Here's where it goes wrong.
1. Risk is assessed at the wrong altitude
A CAB typically reviews at the level of "a change." But risk doesn't live at the level of individual changes — it lives in categories of change. "Restarting a load-balanced web node during business hours" is a well-understood, low-risk operation when you have four healthy nodes behind the balancer. "Restarting a load-balanced web node" is a very different proposition when the cluster is at minimum capacity.
In other words, the risk is a property of the pattern plus the environment state, not the ticket. When you review tickets one at a time, you spend your scarcest attention re-deriving conclusions you already reached fifty times before.
2. Batch approval creates queueing, and queueing is expensive
Little's Law is unforgiving: the average time a change spends in your system equals the number of changes in the system divided by the throughput. If your CAB reviews 40 changes per week and you have 120 in the backlog, the average change waits three weeks. Adding reviewers doesn't fix that. Reducing the number of items that need review does.
Worse, batching has a hidden cost: it destroys the connection between the change and its context. A change written today and reviewed in three weeks is reviewed by someone reading a summary of a summary.
3. It conflates coordination with authorization
Two different jobs get merged into one meeting:
- Coordination: "We should not patch the payment gateway the same weekend as the ERP upgrade."
- Authorization: "This change is allowed to proceed."
Coordination is valuable and needs a calendar, a shared view of scheduled work, and someone watching for collisions. Authorization needs a clear rule set, not a meeting. When you force both through the same weekly slot, the coordination work (which is genuinely useful) gets starved by the authorization work (which is mostly mechanical).
4. The people assessing risk have the least context
The engineer who wrote the change knows exactly what could go wrong. The CAB member reading a two-line description does not. So the board relies on the quality of the paperwork, which rewards people who write persuasive tickets rather than people who understand the system. And because the reviewer can't independently verify anything, the approval becomes a liability-shifting ritual: "I approved what the ticket said."
This is worth sitting with. The CAB often increases organizational risk, because it moves accountability to people who cannot meaningfully assess the thing they're accountable for.
5. It answers "who changed this?" when the question is "why did this break?"
Audit and incident response both need a reliable record of changes. A CAB produces one — but so does a good version control system, a deployment log, and a CMDB that's actually maintained. The CAB's record is expensive to produce and often less accurate than what your pipeline already emits automatically.
The Counterintuitive Research Finding: More Changes, Fewer Outages
Here's where the intuition breaks. Conventional wisdom says that fewer changes means fewer failures. Study after study of high-performing IT organizations says the opposite.
The IT Process Institute has been studying this exact question since 2004, comparing top-performing organizations against their peers to find out which practices actually separate them. The pattern in that research has been consistent and, to a lot of people, counterintuitive: organizations that change more frequently tend to have higher change success rates, not lower. They deploy more often and break less. They also recover faster when something does go wrong.
Why would that be?
Because change frequency and change discipline are correlated, not opposed. Organizations that change often have to build the machinery to do it safely:
- Small, incremental changes that are easy to reason about and easy to reverse
- Automated testing and deployment pipelines
- A clear separation between deploying code and releasing functionality
- Observability that catches regressions in minutes
- Blameless postmortems that feed real learnings back into the process
Organizations that change rarely don't have any of that. They make big, rare, terrifying changes. Those are exactly the changes most likely to fail — because they carry weeks of accumulated differences, they're hard to test, and nobody on the team has practiced the deployment path in months.
So when a CAB throttles change volume, it doesn't reduce risk. It inflates the size and rarity of each change, which is where the risk actually comes from.
This is also why the old statistic — "most unplanned outages are caused by changes" — gets misused so often. Yes, changes are a common trigger for outages. But that's partly because changes are the only time anything meaningful happens in your environment. The useful question isn't "how do we make fewer changes?" It's "what makes a change more or less likely to succeed?" Answer that and you can approve most changes automatically.
The Visible Ops methodology, which ITPI developed through that top-performer research, is built around this idea. It's a short, prescriptive playbook: stabilize the environment, find and fix the things that break, then institutionalize the controls that let you move fast safely. It has sold over 400,000 copies for a reason — it's one of the few frameworks that gives you specific steps instead of a maturity model with pretty colors.
A Better Model: Risk-Based Change Triage
If the problem is that everything goes through one path, the fix is to build more than one path. Most organizations can do this with four tiers.
Tier 1: Standard changes (pre-authorized, no ticket review)
These are changes you've done many times, with a known failure mode and a known recovery. Nobody reviews them individually because the pattern was reviewed once, up front.
Examples: adding a DNS A record in a managed zone, renewing a certificate with automation, deploying a container that passed the pipeline, patching a non-production environment, adding a user to an existing role.
The rule: if it fits the catalog and the preconditions hold, it goes. Log it, don't gate it. Aim to push 50–70% of your change volume into this tier.
Tier 2: Normal changes (peer review, asynchronous)
These carry real but bounded risk. They don't need a committee; they need a knowledgeable second pair of eyes, a rollback plan, and a record. That review can be asynchronous — a pull request approval, a Slack thread, a lightweight checklist signed off by a peer or a service owner.
Examples: configuration changes to production services, database index additions, changes to a monitoring threshold, dependency upgrades.
Tier 3: Significant changes (CAB or a designated reviewer group)
These are the ones where the CAB earns its keep. High blast radius, cross-system dependencies, regulatory exposure, or genuinely novel work.
Examples: major version upgrades of core platforms, changes to identity and access management, network segmentation changes, anything touching regulated data flows.
For this tier, the meeting is worth having — but you should be reviewing maybe 10–20 items a month, not 40 a week. And the review should focus on the failure modes and rollback plan, not the ticket formatting.
Tier 4: Emergency changes (retrospective review)
Break-glass changes where waiting means an ongoing outage or a security exposure. The rule here is simple: act first, document during, review after. The retrospective review is where you decide whether the change should graduate into the standard catalog.
| Tier | Who approves | Target time to approve | Typical share of changes |
|---|---|---|---|
| Standard | Nobody (pre-authorized) | Minutes | 50–70% |
| Normal | Peer or service owner | Same day | 20–35% |
| Significant | CAB / reviewer group | 1–5 business days | 5–15% |
| Emergency | On-call authority | Immediate | <5% (healthy), 20%+ (broken) |
Notice what this does to your meeting. Instead of 40 items and 90 seconds each, you get 8 items and real discussion. The board's attention goes where it can actually change an outcome.
How to Build a Pre-Authorized Change Catalog
This is the highest-leverage piece of work, and it's the one most organizations skip because it sounds boring. It's not boring — it's the whole ballgame. Here's a workable process.
Step 1: Pull 90 days of change data. Every ticket, every deployment, every emergency change. If your records are messy, use deployment logs and incident timelines instead. You need volume and outcomes, not perfection.
Step 2: Group by pattern, not by ticket. "Restart web node," "add firewall rule," "deploy service version," "rotate credential." You'll probably end up with 30–60 patterns covering most of your volume.
Step 3: Calculate the failure rate per pattern. How many of these resulted in an incident, a rollback, or a page? Patterns with a near-zero failure rate and a fast, reliable rollback are your Tier 1 candidates.
Step 4: Write preconditions for each candidate. This is where the real thinking happens. A pattern only qualifies if you can state the conditions under which it's safe. For example, "restart web node" is pre-authorized if at least three healthy nodes remain in the pool, the change window doesn't overlap with a scheduled batch job, and health checks are passing. If the preconditions fail, it drops to Tier 2.
Step 5: Define the automatic rollback. If there's no rollback, it's not a standard change. "Restore from last night's backup" is not a rollback — that's a recovery project.
Step 6: Publish the catalog and wire it into tooling. Where you can, enforce preconditions in code so nobody has to remember them. A pipeline check is better than a policy document every time.
Step 7: Review the catalog quarterly. Add patterns as they prove themselves. Remove any pattern that produces two incidents in a quarter and send it back through review. The catalog should be a living artifact, not a PDF from 2019.
One practical note: start with the patterns that are already generating the most complaints. If your CAB agenda is dominated by certificate renewals and firewall rules, catalog those two things first and you'll cut meeting volume before you've finished step 7.
Worked Example: A Health System Cuts Change Lead Time From 21 Days to 6
Let's make this concrete. This is a composite scenario drawn from the pattern I've seen across mid-size healthcare IT departments, where regulatory pressure and legacy systems tend to make change management especially heavy.
The situation. A regional health system with about 900 beds across four campuses. Roughly 1,400 IT staff. Their CAB met weekly, with 18 standing attendees and 50–70 changes per agenda. One in three changes went through the emergency path because the standard path averaged 21 days.
Two things were driving the emergency volume. First, EHR vendor patches arrived on a monthly cadence with a narrow support window, and the CAB schedule didn't line up with it. Second, clinical device integrations broke in ways that needed same-day fixes.
What they did.
- They pulled 12 months of change records and grouped them into 47 patterns.
- They found that 61% of their change volume fell into nine patterns with a combined failure rate under 1%: certificate renewals, DNS updates, non-prod deployments, workstation imaging, standard firewall rules, Active Directory group membership changes, backup job adjustments, monitoring threshold tweaks, and read-only service account creation.
- They wrote preconditions and rollback steps for all nine, then moved them into Tier 1. The CAB stopped seeing them.
- They moved peer review for Tier 2 into a service-owner approval queue in their ITSM tool, replacing the weekly meeting slot entirely.
- They cut CAB membership from 18 to 7, and moved the meeting to biweekly. They also introduced a standing "significant change" review that happens asynchronously 48 hours before the meeting, so discussion time is spent on the actual risks.
- They added a rule: any emergency change that recurs three times gets a catalog entry within 30 days.
What changed after nine months.
- Average change lead time dropped from 21 days to 6 days (and to under a day for Tier 1).
- Emergency changes fell from 33% of volume to 9%.
- Change-related incidents dropped by about a third, even though total change volume went up roughly 40%.
- The CAB meeting shrank from 90 minutes to 45 minutes, and attendees reported that it was actually useful for the first time in years.
- The compliance team's audit findings didn't increase. They improved, because the records were now generated automatically rather than hand-entered.
What nearly derailed it. Two things. First, a service owner pushed back hard on losing CAB approval, because they'd been using the CAB as cover for decisions they didn't want to own. That's a real issue and it needs to be addressed directly, not worked around. Second, the catalog drifted for about four months until someone was given explicit ownership of it — a named person, with time allocated. Unowned catalogs rot.
Rewriting the CAB Charter: Scope, Membership, and Decision Rights
If you're going to keep a CAB — and most organizations should, in some form — make it a real decision-making body with a written charter. Vague charters are why these meetings drift.
Scope. State explicitly what the CAB decides and what it doesn't. A workable version: the CAB approves significant changes (Tier 3), resolves scheduling conflicts between significant changes, and reviews emergency change retrospectives. It does not approve standard or normal changes, and it does not review routine patching.
Membership. Cap it. Seven to nine people is plenty. Include people with genuine veto authority: the service owner for the affected system, security, the operations lead who would carry the pager, and someone from the business for customer-facing changes. Everyone else gets the minutes.
Decision rights. For each tier, name the single accountable role. Committees diffuse accountability, which is exactly what people use them for when they're afraid. "Operations director owns Tier 2 decisions" is a better rule than "the board reviews it."
Quorum and escalation. Define what happens when a required reviewer is unavailable. "The change waits for the meeting" is how you get 21-day lead times. Give every role a named delegate.
Termination criteria. Agree up front on what the CAB will stop doing. Review it every six months and remove at least one category of change from its scope. A CAB that only ever expands is a CAB that will eventually collapse under its own weight.
Metrics: How to Tell If Your CAB Is Working
You can't manage this by feel. Track a small set of numbers and look at trends, not snapshots.
- Change lead time. From "code committed" or "request submitted" to "in production." Segment by tier. This is your primary signal.
- Change success rate. Percentage of changes completed without a rollback, incident, or unplanned remediation.
- Emergency change ratio. Percentage of changes that used the break-glass path. Healthy is under 10%. Above 25% means the standard path is broken.
- Time in CAB queue. Median and 90th percentile days between submission and decision.
- Approval rate. If it's above 95%, your CAB is a formality. If it's below 70%, your intake process is probably unclear.
- Percentage of changes pre-authorized. Should be climbing toward 50–70% in the first year.
- Change-related incident rate. Incidents traced to a change, as a share of total incidents.
- Rework rate. Changes that fail and have to be redone. High rework with low failure visibility usually means people are quietly fixing things without recording them.
One caution: don't use these metrics to rank teams or individuals. The moment change success rate becomes a performance score, people stop logging changes, and your data gets worse in exactly the way that matters most.
The Culture Problem Nobody Wants to Talk About
You can redesign the process in a quarter. The culture takes longer, and it's the part that decides whether the redesign sticks.
The CAB often exists because someone, at some point, got burned. A change went wrong, it was visible to leadership, and the response was to add a control. That's a rational response to a blame-oriented culture. If the punishment for a failed change is a career setback, people will build elaborate approval rituals to spread the blame around.
That's the real function of many CABs: distributed accountability. Everyone approved it, so no one is at fault.
You can't fix change management without addressing that. Three things help:
Blameless postmortems, done properly. The goal is to find the conditions that made the failure likely, not to identify the person who typed the command. If your postmortems end with an action item like "be more careful," you're doing it wrong. Look for the missing guardrail, the confusing interface, the alert that didn't fire, the documentation that was six months out of date.
Explicit, named ownership. When decisions have one owner instead of a committee, people can act quickly and can also be held to a standard. That sounds scarier, and it is — but it's the only way to build the judgment that fast-moving organizations rely on.
Separate the decision from the outcome. A well-reasoned change that fails because of an unforeseen interaction should be treated differently from a change pushed without testing because someone was in a hurry. Judge the process, not the dice roll.
There's a fourth thing, and it's harder: leadership has to visibly tolerate a bad outcome occasionally. If the first incident after you loosen controls triggers a freeze, you've taught everyone that the old way was right.
Common Mistakes When Fixing the CAB
I've watched a lot of these transformations, and the same failure modes show up.
Mistake 1: Automating the existing process. You put the same 12-field form into ServiceNow with a nicer UI. Now the bottleneck is digital. Approval volume is the problem, not the tooling.
Mistake 2: Creating a "lite" tier with no criteria. If Tier 1 is defined by vibes, it becomes either useless or a loophole. Write preconditions. Test them.
Mistake 3: Keeping the meeting but shortening it. A 30-minute meeting that still reviews everything is the same bottleneck with better posture.
Mistake 4: Declaring victory too early. The first two months feel great. Then someone has an incident, pressure mounts, and the old process creeps back in through "temporary" exceptions. Plan for the backlash.
Mistake 5: Forgetting compliance and audit. Bring your auditors into the redesign early. In most cases they care about demonstrable control, not committee review — and an automated, auditable pipeline is often a stronger control than a signed form. If you're in a regulated industry, get this aligned before you change anything.
Mistake 6: No owner for the catalog. Someone has to own it, with actual allocated time. Half a person is enough. Zero people is not.
Mistake 7: Measuring only speed. A CAB that approves everything instantly is not a success. Pair lead time with change success rate and incident data, or you'll optimize your way into an outage.
Where the IT Process Institute Fits In
Everything above is a design problem, and design problems are easier when you have data from organizations that already solved them.
The IT Process Institute has been doing this research since 2004, comparing top-performing IT organizations against their peers to isolate which practices actually differentiate them. Their work is prescriptive rather than descriptive — they don't just tell you what high performers look like, they give you the steps to get there. That's a meaningful difference when you're the person who has to show up on Monday with a plan.
For change management specifically, the Visible Ops series is the practical starting point. The Visible Ops Handbook covers the core sequence: stabilize the environment, find and fix what breaks, and then institutionalize the controls that let you move fast without losing control. Visible Ops Security and Visible Ops Cybersecurity extend the same thinking to security and compliance, which matters if your CAB is partly a compliance artifact. Visible Ops Private Cloud addresses the cloud migration context where change volume explodes. And VisibleOps A.I. applies the methodology to AI governance — a domain where change management questions are arriving faster than most organizations can build answers.
If you're rebuilding a change process, the sequence matters. Most teams try to skip straight to tooling. The research is pretty clear that the environment stabilization step comes first, because you can't safely loosen controls in an environment you don't understand. You need to know what you have, what breaks, and how it recovers before you can write preconditions for anything.
ITPI also runs webinars and publishes benchmarking studies and executive snapshots, which are useful if you need to make the case to leadership that your change process is an outlier. Nothing lands in a steering committee quite like a benchmark showing your peer group is deploying ten times more frequently with fewer incidents.
FAQ: Change Advisory Boards and IT Delivery Speed
Is it safe to stop reviewing low-risk changes?
Yes, as long as you've done the work to know they're low-risk. That means analyzing historical failure rates for the pattern, not just the individual ticket, and writing explicit preconditions. The riskiest version of "stop reviewing" is when a team declares things standard without any data behind it.
How do we handle auditors who want evidence of change approval?
Talk to them before you change anything. Most audit frameworks care about demonstrating that changes are controlled, authorized, and auditable — they don't require a committee. Automated pipeline gates, peer-review records, and deployment logs often satisfy auditors more completely than meeting minutes, because they're harder to fabricate. Get the requirement in writing, then design to it.
What if our organization is too small for multiple tiers?
Small organizations benefit most from Tier 1 and Tier 4. You probably don't need a formal CAB at all — you need a peer review habit and a documented standard change catalog. The trap for smaller teams is copying an enterprise process designed for 10,000 employees.
Won't removing CAB approval make people less careful?
Carefulness comes from clear ownership, good tooling, and knowing someone will look at the postmortem — not from a weekly meeting. In practice, the opposite happens: when people own their decisions, they think harder about them. The CAB often reduces carefulness by giving people a place to hand off responsibility.
How long does a change management redesign take?
The process change can be done in 8–12 weeks if you have decent historical data. Culture change takes 6–18 months, and you should expect at least one incident that makes everyone nervous. Plan for it, respond to it calmly, and don't let it revert the whole program.
What if our change data is a mess?
Use deployment logs, incident timelines, and version control history instead. You don't need perfect data; you need enough to spot patterns with clearly different failure rates. Even 60 days of incomplete records will usually surface the top candidates.
How do we handle changes that span multiple teams?
Cross-team changes belong in Tier 3 or Tier 2 with a named coordinating owner. The coordination problem is real and needs solving — but solve it with a scheduling owner and a shared calendar, not by routing everything through a weekly committee.
Does this apply to AI and machine learning changes?
Increasingly, yes, and it's a live problem. Model updates, prompt changes, and data pipeline shifts can change behavior in ways that are hard to test. The good news is the same principle applies: define patterns, set preconditions, automate what you can verify, and reserve human review for genuinely novel or high-impact changes.
Next Steps: A 30-Day Starting Plan
You don't need a six-month program to get moving. Here's a sequence that produces visible results quickly.
Week 1 — Get the data. Pull 90 days of change records, deployments, and change-related incidents. Group by pattern. You'll be surprised how concentrated the volume is.
Week 2 — Pick your top five. Identify the five patterns with the highest volume and the lowest failure rate. Those are your first Tier 1 candidates. Write preconditions and rollback steps for each.
Week 3 — Rewrite the agenda. For one meeting, explicitly exclude anything that's now in Tier 1. See what's left. Notice how much better the discussion gets when there's room for it.
Week 4 — Assign ownership. Give one person ownership of the standard change catalog, with real time allocated. Set a biweekly review. Announce the change in emergency-change ratio you're targeting, and start tracking lead time by tier.
Then repeat. Add patterns, tighten preconditions, shrink the CAB agenda again.
The goal isn't to eliminate the CAB. It's to make it do the work that only a group of experienced people can do — the genuinely hard, novel, high-stakes decisions — while everything else flows through paths that were designed and tested in advance. That's how top performers get both speed and stability. Not by choosing between them, but by building the discipline that makes the choice unnecessary.
If you want a structured path instead of assembling it from scratch, ITPI's research and the Visible Ops series give you a proven sequence to follow — and a benchmark to measure yourself against. Start with the handbook. It's short, it's specific, and it assumes you have a real job to do.
